August 8 - 10, 2010    Beijing , China
Methods and Techniques for Software Development, Software Maintenance, Requirements Engineering, Model-driven Architecture and Engineering,Re-engineering and Reverse Engineering, Software Management, Model Engineering ,Software Architectures Design, Frameworks and Design Patterns, Architecture-Centered Development, Component-based Design , Middleware Components, Software Quality, Quality Management and Assurance, Risk Analysis, Program Analysis, Verification and Validation, Testing of Software Systems, Soft

Ort

Location: Beijing International Convention Center
Beijing International Convention Center and Beijing Continental Grand Hotel are a well known enterprise in Beijing. Opened in 1990, the convention center has served almost 1,000 different..
Kontaktieren 8 Beichen Dong Road, Chaoyang District, P. R. China 100101 Beijing , China
(8610)84979768 84985588--72601、72602