Conference · Houston, Texas
Modular Construction & Prefabrication 2010
Building, Construction · Architecture
Key numbers
- Editions on record
- 7first in 2010
About Annual Modular Construction & Prefabrication Summit
Modular Construction & Prefabrication will delivery case studies from regional leading companies, such as Fluor Group, Foster Wheeler and Shaw group, in the mining, resources and energy sectors that will outline best practice of use of modular construction as well as addressing the key challenges when come to decide the build method. View the complete agenda or download additional content online at www.modularconstructionevent.com.
Be the first to join in and get benefit from discussing and disserting the key topics including: how to conduct a Cost/Benefit analysis, the highlight of different form of risks, understand the Project Management System usage and Mitigating logistic challenges of moving modular construction over land. Please view the website for pricing options on www.modularconstructionevent.com. The Modular Construction & Prefabrication networking and events group on LinkedIn is available at http://events.linkedin.com/Modular-Construction-Prefabrication-2010/pub/385314
From our listing of this edition. Details may have changed since.
Editions
| Year | Dates | Where | Exhibitors | Visitors |
|---|---|---|---|---|
| 2015 | 7–9 Dec 2015 | DoubleTree by Hilton Hotel Houston Greenway Plaza Houston, Texas | — | — |
| 2014 | 8–10 Dec 2014 | Hilton Houston North Houston, Texas | — | — |
| 2012 | 10–12 Dec 2012 | Renaissance Houston Greenway Plaza Hotel Houston, Texas | — | — |
| 2012 | 26–28 Mar 2012 | Calgary Telus Convention Centre Calgary, Canada | — | — |
| 2011 | 14–16 Nov 2011 | Strand at Rugby Quay Brisbane, Australia | — | — |
| 2011 | 20–21 Jul 2011 | Strand at Rugby Quay Brisbane, Australia | — | — |
| 2010 | 7–10 Dec 2010 | Hyatt Regency Houston Houston, Texas | — | — |
Past editions from the bvents archive (2008–2019) and organiser figures where they were published.