Conference · Suntec City, Singapore

Tunnel Design & Construction Asia 2011

Building Machinery · Building, Construction · Design, Industrial Design

Dates22–23 Jun 2011This edition has ended
VenueAmara SingaporeSuntec City, Singapore
RunningSince 2011Annual · 5 editions on record
Last checked12 Nov 2026Its old website no longer answers
This is the 2011 edition. It has ended. See Tunnel Design & Construction Asia's current page for the next dates.

Key numbers

Editions on record
5first in 2011

About Tunnel Design & Construction Asia

Tunnel Design & Construction Asia 2011 will examine:

* Master plans and upcoming projects for road/rail, water/wastewater and utility tunnel infrastructure

* Funding, legal and contractual requirements

* Best practices in geotechnical investigations and instrumentation

* Urban tunnelling techniques

* Optimal selection of construction procedures in NATM and Mountain tunnelling

* TBM selection procedures for different soil/rock conditions

* Handling technical and construction contract risks

* Fire safety and ventilation design for long and immersed tunnels

The following trends in tunnel design and construction will also be presented:

* Design and construction of shafts and portals

* Safety codes and procedures in tunnel construction

* Handling squeezing ground conditions during construction

* Effective use of geotechnical baseline reports

* Retrofit and upgrade of existing tunnels

From our listing of this edition. Details may have changed since.

Editions

YearDatesWhereExhibitorsVisitors
201519–20 Mar 2015Amara Hotel
Singapore
——
201419–20 Mar 2014Amara Hotel
Singapore
——
201319–20 Mar 2013Amara Hotel
Singapore
——
201228–29 Feb 2012Hong Kong Convention and Exhibition Center
Hong Kong
——
201122–23 Jun 2011Amara Singapore
Suntec City, Singapore
——

Past editions from the bvents archive (2008–2019) and organiser figures where they were published.

Industries