Conference · Abu Dhabi, United Arab Emirates
Pumps Reliability and Efficiency 2012
Energy · Engineering
Dates1–3 Apr 2012This edition has ended
RunningSince 2011Annual · 7 editions on record
Last checked12 Nov 2026Organiser website checked
This is the 2012 edition. It has ended. See Pumps Reliability and Efficiency's current page for the next dates.
Key numbers
- Editions on record
- 7first in 2011
About Pumps Reliability and Efficiency
Pumps are inherently unreliable. For pumps, seals and bearings to be reliable, everything must be done right. We must design systems properly, set-up piping properly, select the right pump - both hydraulically and mechanically, install it correctly, operate it at the correct flow rate and maintain it properly. A seal failure is just a sign that we have a problem with our pumping system. A course on reliability therefore needs cover everything to do with the pump and system.
From our listing of this edition. Details may have changed since.
Editions
| Year | Dates | Where | Exhibitors | Visitors |
|---|---|---|---|---|
| 2015 | 28–30 Jan 2015 | Accra International Conference Centre Accra, Ghana | — | — |
| 2014 | 28–30 Jan 2014 | Accra International Conference Centre Accra, Ghana | — | — |
| 2013 | 28–30 Jan 2013 | Accra International Conference Centre Accra, Ghana | — | — |
| 2012 | 14–16 May 2012 | Crowne Plaza Abu Dhabi Abu Dhabi, United Arab Emirates | — | — |
| 2012 | 1–3 Apr 2012 | Crowne Plaza Abu Dhabi Abu Dhabi, United Arab Emirates | — | — |
| 2012 | 28–29 Mar 2012 | Hilton Sandton Hotel Sandton, South Africa | — | — |
| 2011 | 24–25 Aug 2011 | — | — |
Past editions from the bvents archive (2008–2019) and organiser figures where they were published.