Conference · London, United Kingdom

Offshore Cable Installation, Engineering & Maintenance

Energy · Clean Energies · Cable, Wire

Official website
Next editionNot confirmedLast edition we have: 29–30 May 2012
Last venueCBI Conference CentreLondon, United Kingdom
RunningSince 2011Frequency unknown · 2 editions on record
Last checked12 Nov 2026Organiser website checked
We haven't confirmed the next dates yet. The last edition in our records was 29–30 May 2012 at CBI Conference Centre. Check the organiser's site: windpowermonthly.com. Are you the organiser? Correct this listing.

Key numbers

Editions on record
2first in 2011

About Offshore Cable Installation, Engineering & Maintenance

Back for its 2nd year, Windpower Monthly is pleased to announce that its Offshore Cable Installation, Engineering & Maintenance Forum is taking place on 29-30 May 2012 in London.

Cables on offshore wind farms are notoriously difficult to install and maintain with the critical consequences of cable damage or failure that could halt power generation. The programme for 2012’s event has been carefully researched with over 50 offshore wind energy professionals to make sure you find the solutions to your biggest challenges and gain insights into hot-button issues throughout the lifetime of the cable, including:

-What will future cables look like & how will installation & long-term power generation be improved to avoid the common failures happening today?

-Developing a quick, efficient cable installation strategy to reduce costs & ensure smooth operations

-What tools & techniques could reduce insurance premiums?

-Assessing cable burial needs & choosing the best trenching methods for different sites

-Evaluating current & future cable protection systems to choose the correct solutions at the right cost

-What vessel & access solutions are there for cable installation in far-offshore, deep water sites?

-Identifying cost-effective tools for monitoring cable behaviour and failures during maintenance

-Building a fast, robust cable repair strategy to reduce downtime

PLUS! Benefit from an in-depth briefing on 31 May where key industry stakeholders will debate how standards for cable specification, installation & maintenance would reduce costs and what these standards should look like.

This forum is perfect for representatives from developers/project owners, WTG OEMS, and cable manufacturers and installers with the following job titles:

Director/Head/Manager of:

-Cables

-Electrical Engineering

-Installation<br

From our listing of this edition. Details may have changed since.

Editions

YearDatesWhereExhibitorsVisitors
201229–30 May 2012CBI Conference Centre
London, United Kingdom
——
201128–30 Sep 2011——

Past editions from the bvents archive (2008–2019) and organiser figures where they were published.

Questions

When is Offshore Cable Installation, Engineering & Maintenance?

The next dates haven't been confirmed. The last edition we have on record was 29–30 May 2012.

Where is it held?

The last edition we have was at CBI Conference Centre, London, United Kingdom.

Industries