Exhibition · Bangkok, Thailand
Modular & Off-site Construction
Engineering · Subcontracting · Building, Construction
Key numbers
- Editions on record
- 1first in 2012
About Modular & Off-site Construction
Modular construction is both a boon and a bane for the construction industry. A boon because it offers greater flexibility in our construction methods. A bane because if not done correctly, it takes time, effort and money to fix. For those who become adept at mastering the fine art of modular construction, the ROI far outweighs the initial teething issues.
According to the Singapore Builders Directory 2011/2012, "Productivity and quality improvements require continuous innovation and technological leverage. Prefab components will not only ensure higher quality and consistency, but will go a long way towards ensuring higher productivity for the construction sector'.
Trueventus recognises the unique challenges posed by the modular method, but at the same time understand that the construction industry has benefited greatly from it. With this, Trueventus has put together the Modular and Off-Site Construction conference which will be held on June 27-28, 2012 at the Royal Orchid Sheraton Hotel & Towers in Bangkok. Under that one roof, we will have a stellar cast of construction and modular experts from around the APAC and GCC region. Senior representatives from Worley Parsons, Foster Wheeler, Leighton, Carber and UGL Builders, among others, will present international case studies on modular construction and discuss the various challenges in ensuring modular construction works for as opposed to against the builders.
THIS UNIQUE CONFERENCE WILL BRING DELEGATES THE BENEFITS OF:
• Improving productivity and contributing to a company’s bottom line
• Delivering projects on time as per committed date
• Understanding the key benefits of using modular techniques
• Reevaluating the best methodology that suits a project
• Discovering the decision-making process and applications in constructing a project
• Identifying the fabrication process that provides the greatest benefit at the lowest co
From our listing of this edition. Details may have changed since.
Editions
| Year | Dates | Where | Exhibitors | Visitors |
|---|---|---|---|---|
| 2012 | 27–28 Jun 2012 | The Royal Orchid Sheraton Bangkok, Thailand | — | — |
Past editions from the bvents archive (2008–2019) and organiser figures where they were published.
Questions
When is Modular & Off-site Construction?
The next dates haven't been confirmed. The last edition we have on record was 27–28 Jun 2012.
Where is it held?
The last edition we have was at The Royal Orchid Sheraton, Bangkok, Thailand.