Workshop · Miri, Malaysia
6-Stage Hazards - Malaysia
Petrochemistry · Oil, Gas · Engineering
Key numbers
- Editions on record
- 1first in 2015
About 6-Stage Hazards - Malaysia
6-stage hazard studies have shown that they can improve process safety and enhance project management from concept through design and construction to operation – they give better financial control, better time management and reduce last minute changes. The system allows critical issues to be identified and resolved early in the life of a project, reduces reliance on HAZOP at too late a stage in the design and provides a framework for incorporating health, safety and environmental issues.
From our listing of this edition. Details may have changed since.
Editions
| Year | Dates | Where | Exhibitors | Visitors |
|---|---|---|---|---|
| 2015 | 20–23 Apr 2015 | Miri Indoor Stadium Miri, Malaysia | — | — |
Past editions from the bvents archive (2008–2019) and organiser figures where they were published.
Questions
When is 6-Stage Hazards - Malaysia?
The next dates haven't been confirmed. The last edition we have on record was 20–23 Apr 2015.
Where is it held?
The last edition we have was at Miri Indoor Stadium, Miri, Malaysia.